Wynyard Walk, Sydney, Australia
Client: Thiess
Architect: Woods Bagot
About the project:
Wynyard Walk consists of a new pedestrian tunnel link and footbridge between Wynyard Station and the developing CBD western corridor and Barangaroo. As part of the Thiess contractor team, NDYLIGHT were responsible for the delivery of the architectural lighting design
One of the main features is a 130 metre stretch of pedestrian tunnel from the Western Portal to Wynyard Station. NDYLIGHT worked closely with Woods Bagot to realise the flowing lines of light so essential to the architectural vision of the project.